BESTimate
BESTimateby FK Consultant
BMC USOR 2023

Click a line to add its length to the ticked item — each side of a rectangle or polyline is its own line · click inside a hatch for L × B · click again to take it out · scroll to zoom, drag to move.

Rate bookBMC USOR 2023
Sections0heads of work
Items00 measurement lines
Works total₹ 0before charges
Estimated cost₹ 0not saved yet

1Project details

2Works, items & measurements

Quantity = F × No. × % × L × B × H (blank boxes are skipped). Tick Deduct for openings (F = −1). Use + Heading for location lines like “Fish market”.
Faster entry: Enter moves to the next box and makes a new row at the end · an empty box shows the value from the row above in grey, press = or double-click to take it · ⧉ copies a whole row · paste rows straight from Excel (Particulars, No., %, L, B, H).

3Bill of quantity & charges

Charges on the Summary sheet

Each charge is worked on the last Total line, unless set to “on works total”. Tick Total after to print a Total line under it.