CodeDescriptionUnitRate
8.01Labour for filling pot holes with premix asphalt chips, cleaning the road surface with wire brushes and gunny bags, applying tack coat, spreading mixture hand ramming or light compaction with power roller conveying material to the site of work (excluding cost and of material fuel and heating asphalt) etc complete.sqm₹ 73
8.02Labour for metal patch repairs including preparing surface, adding required quantity of metal, murum, watering, ramming etc complete. Spec.No.: As directed by Engineer- in- charge. (excluding cost and of material)sqm₹ 94
8.03Restoration of rain cuts with soil, murum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORTH specification clause 3002cum₹ 199
8.04Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC as per MORTH specification clause 3003sqm₹ 52
8.05Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings as per MORTH specification clause 3003sqm₹ 21
8.06Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75mm B.M, applying bitumen tack coat at the bottom and vertical sides as per as per MORTH specification clause 3004.1 and 3004.2cum₹ 8,939
8.07Patch repair on already filled pot holes with 20 mm premix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2sqm₹ 230
8.08Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat as per MORTH specification clause 3004.1 and 3004.2sqm₹ 342
8.09Maintenance of gravel road including making up the loss of profile, rectifying corrugated surface, filling up of depressions, pot holes and erosion gullies by adding fresh material and compacting it with appropriate equipment or to strip excess of material from the road surface as per drawings etc completesqm₹ 104
8.10Providing pick and roll surface bypicking the old WBM surface to the required standard, adding 30% of 40mm size metal and required quantity of murum including laying sectioning, watering, compacting with static roller with thin layer of murum blindage on carrageway, watering and compacting by static roller, including cost of all materials, loading, unloading, stacking and labour etc. complete. Spec.No.: As directed byEngineer- in-charge.sqm₹ 115
8.11Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling etc. completesqm₹ 250
8.12The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains etc. completermt₹ 18
8.13Maintenance of Hume pipe Culvert bywayof Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing etc. completenos₹ 2,423
8.14Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings etc. completekm₹ 4,798
8.15Maintenance of Kilometer stones, and 200 metre by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone etc. completekm₹ 1,086
8.16Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location etc. completenos₹ 258
8.17Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. completesqm₹ 8
8.18Maintenance of guard stones/ boundrystones/ indicator stones bywayof refiting of tilted stones repairing with cement mortar, cleaning, repairing and white washing etc. completekm₹ 1,081
8.19Repair of steel railing to bring it to original shape cleaning and repainting as per drawing etc. completermt₹ 435
8.20Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings etc. completermt₹ 835
8.21Removal of steel railing and refixing of railing to submersible bridges including cleaning and repainting etc completermt₹ 506
8.22White washing two coats on parapet walls and white washing and geru lime painting to tree trunks including preparation of surface by cleaning scraping etc. completesqm₹ 26
8.23Dressing of side shoulder / Scrapping the road side shoulder by Mechanical means ( By JCB /DOUZER) including excavation of raised side shoulders upto 15cm depth including remooving /cutting bushes,grass anddressing shoulderto desired camber anddisposing of excavated stuff up to road boundary etc complete. as directed by Engineer In Charge.sqm₹ 10
8.24Providing andLayingPressureSensitiveTechnology(PST)based Insstapattch readymix compound for repair potholes, manufactured from aggregates of 4-12 mm, treated with special grade bitumen, Pressure Sensitive Polymer( PSP) and Cross Linking Chemical (CLC) agents etc, technically evaluated for repairs on bitumenous/concrete surfaces, confirming to CRRI and IRC accreduted norms for pressure sensitive polymer products for repairs of Potholes on road/ Pavements, havinfgupto 25mmthick insstapattch layer on base of compacted aggregates ( Crusher Brocken) of 50mm thickness including labours, material, tools and tampering etc complete.sqm₹ 938
8.25Providing, laying and rolling Micro seal surfacing ( 10 mm thick) for preventive maintainance including supplying all materials, preparing the existing road surface, heating bitumen, aggregates, lime in hot mix plant, laying the mix seal surfacing by paver finisher and compaction by power roller etc complete.( Using 60/70 bulk bitumen for mixing and tack coat over black topped surface by using 0.14 Cum per 10 Sqm. of crusher aggregate passing 100 % through 6.30 mm sieve and retained100 % on 0.075 mm size sieve 0.2 Kg / Sqm lime and 11.00 kg / 10 Sqm bulk bitumen for fixing and 0.50 kg / Sqm for tack coat) Spec: As directed by Engineer In Charge and IRC SP 78 - 2008sqm₹ 136
8.26Providing, laying and rolling Micro seal surfacing ( 10 mm thick) for preventive maintainance including supplying all materials, preparing the existing road surface, heating bitumen, aggregates, lime in hot mix plant, laying the mix seal surfacing by paver finisher and compaction by power roller etc complete.( Using 60/70 bulk bitumen for mixing and tack coat over black topped surface by using 0.14 Cum per 10 Sqm. of crusher aggregate passing 100 % through 9.50 mm sieve and retained100 % on 0.075 mm size sieve 0.2 Kg / Sqm lime and 9.50 kg / 10 Sqm bulk bitumen for fixing and 0.50 kg / Sqm for tack coat) Spec: As directed by Engineer In Charge and IRC SP 78 -2008sqm₹ 127
8.27Providing and laying shoulder drain of trap rubble of 0.45 x 0.45 meter section at 45 degree angle to the road edge including hand packing, filling voids with sand/shingle of approved quality and ramming etc. complete as desired.rmt₹ 353
8.28Providing and laying Pressure Sensitive Technology ( PST) based ready mix compound for repairing potholes, manufactured from aggregates of 4-12mm, treated compound having mix of bituminous antistriping compound, stabilizer, Pressure Sensitive Polymer and water repellent compound like oil soluble polyacid etc. having good consistency for laying, technically evaluated for repairs on bituminous/concrete surface confirming to CRRI and IRC accrediated norms for pressure sensitive polymer products for repairs fo potholes on road/ pavement having upto 25mm thick ready thickness including labours, material, tools and tampering etc. complete. (Undertaking shall be taken from the supplier before starting the work)sqm₹ 881
8.29Supply of self watering system Multi Stage Tree guard / Protctor 110 mm dia & total height of 1800 mm made up with HDPE. In tubular section, first stage will be 600mm long & second and forth stage 65% perforated casting in HDPE tubular section of 300mm long each tubular section & third and fifth stage of plain 300mmlong eachtubular section in 110mm dia. all sections fix with stagewise with leakproof fixing arrangement 2 no tubular rubber section of 75mm dia, 1.5mm thick & length 350 mm (fix on both 65% perforated tubular section at top for increase the water holding capacity as per plant height). The speciallydesigned rubber water holding device of size 90mm dia outerside & 12mm dia innerside of 1.5mm thick as per design fix on 40mm dia. 100mm long pvc pipe seperately.(for inserting the plants). 2 nos 40mm dia. treated bamboo of 2.00 mtr. height (buried 150 mm below the bottom of excavated pit & stand with tubular section) 2 nos rubber/pvc ties ( fix at bottom & top of plain tubular section with bamboo) 2 nos 5mm dia. fromate (fixing at bottom o tubular section for deep root irrigation system) 2 nos 600mm longHDPE lateralpipe of5mm dia.with deeproor irrigation system (insert in the gromate & pit, away form 200 mm from plant roots). 1200 mm long barbed wire of 14 guage (The treeguard is rapping with 1200 mm long barbed wire over third plain tubular section for protection against cattles & other external factors) as per technical specification & manual. ( Cost of Plant & fixing charges will be extra as per approved rates). (Note:- Plant Height should be required above 2.50 m & Dia of stem 25 mm at bottom)nos₹ 1,290
8.30Supply of self watering system tree guard in 110 mm dia, 1.80 mt height made up of cotton canvas cloth of polymer pipe of 15 litres water storage capacity stand with 2 nos. 40 mm dia treated bamboo of 2 mt ht. tie with tag at two nos and specially designed dexpandable rubber seal 110 mm dia outer & 25 mm dia. inner dia installed on bottom of pipe, and 0.60 m long HDPE lateral pipe 2 nos 5mm dia to carrythe water near root zone connected with gromate fix in treeguard and rapping 1.20m long barbed wire to middle of treeguard for protection agianst cattles and other external factors as per specification. ( cost of plant & fixing charges will be extra as per approved rates). (Note:- Plant height should be required above 2.50 m & Dia of stem 25 mm at bottom)nos₹ 1,127
8.31Fixing and Transporting of self watering system tree guard-insertion of sapling in self watering tree guard and capping the bottom with expandable rubber seal. Supporting the bamboo with the help of cable tie. Bamboo to be buried 0.15 mt ht. below of excavated pit. Strengthening the bamboo in pit with adequate measures. Circulating the barbed wire around tree guard at middle ht. from bottom and fixing it. Thr rates excluding the cost of barbed wire, bamboo, expandable seal, tree guard and all other required material. Fixing to be carried out as per manual instruction.nos₹ 125
8.32Providing 50 mm thick Full grout bituminous treatment including supplying all materials,prepairing theexisisting roadsurface,applyingtack coat @ 0.735kg / sqm andlaying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 5.00 kg / sqm, spreading chips and laying seal coat of specified Grade of bitumen of 1.70 Kg/sqm and compacting, making the surface good etc. complete ( For only Patch Repair works / For Road work) (VG-30 bulk bitumen rates are considered to arrive at rates)sqm₹ 715
8.33Providing 50 mm thick semi grout bituminous treatment including supplyingall materials,prepairing theexisisting roadsurface,applyingtack coat @ 0.735kg / sqm andlaying the required thickness of metal layer, heating and spraying bitumen of specified Grade at the rate of 2.75 kg / sqm, spreading chips and laying seal coat of specified Grade of bitumen of 1.25 Kg/sqm and compacting, making the surface good etc. complete ( For only Patch Repair works / For Road work) (VG-30 bulk bitumen rates are considered to arrive at rates)sqm₹ 552
8.34Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubbleobtained byblasting),heating andspraying the bitumen ofVG-30 grade@ 2kg / sqm, spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. ( For Repair works only)sqm₹ 331
8.35Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surfaceincludingallmaterials, preparingtheexisting roadsurface, spreading40mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting), heating and spraying the bitumen of VG-30 @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat at the rate of 0.30 Kg Sqm.( for repair works only)sqm₹ 265
Make the estimate with these rates. BESTimate fills the description, unit and rate when you pick the item code — Measurement, Abstract and Summary in Excel.Try BESTimate →

Source: State Schedule of Rates 2022-23, Public Works Department, Government of Maharashtra — completed rates excluding GST. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.

Need the full estimate, not just one item?

BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.

Pre-register free →

Made free with BESTimate by F K Consultant · estimate.fkconsultant.com/calculators · approximate figures — check against your drawings and local rates.