Free civil calculators

RCC ESRs

MJP SSR 2023-24 · section K2

48 items of section K2 (RCC ESRs) of the MJP SSR 2023-24 — code, description, unit and rate. Units: job, litre.

← All sections of MJP SSR 2023-24

CodeDescriptionUnitRate
K2-1Upto 25,000 litreslitre₹ 39.02
K2-2Cost of 25,000 litres capacityjob₹ 975,465
K2-3Add for capacity above 25,000 upto 50,000 litreslitre₹ 20.39
K2-4Cost of 50,000 litres capacityjob₹ 1,485,227
K2-5Add for capacity above 50,000 upto 75,000 litreslitre₹ 14.4
K2-6Cost of 75,000 litres capacityjob₹ 1,845,104
K2-7Add for capacity above 75,000 upto 1,00,000 litreslitre₹ 13.4
K2-8Cost of 1,00,000 litres capacityjob₹ 2,180,003
K2-9Add for capacity above 1,00,000 upto 1,50,000 litreslitre₹ 10.57
K2-10Cost of 1,50,000 litres capacityjob₹ 2,708,273
K2-11Add for capacity above 1,50,000 upto 2,00,000 litreslitre₹ 9.62
K2-12Cost of 2,00,000 litres capacityjob₹ 3,189,433
K2-13Add for capacity above 2,00,000 upto 2,50,000 litreslitre₹ 8.53
K2-14Cost of 2,50,000 litres capacityjob₹ 3,615,901
K2-15Add for capacity above 2,50,000 upto 3,00,000 litreslitre₹ 7.73
K2-16Cost of 3,00,000 litres capacityjob₹ 4,002,252
K2-17Add for capacity above 3,00,000 upto 4,00,000 litreslitre₹ 7.58
K2-18Cost of 4,00,000 litres capacityjob₹ 4,760,006
K2-19Add for capacity above 4,00,000 upto 5,00,000 litreslitre₹ 6.85
K2-20Cost of 5,00,000 litres capacityjob₹ 5,445,500
K2-21Add for capacity above 5,00,000 upto 7,50,000 litreslitre₹ 6.67
K2-22Cost of 7,50,000 litres capacityjob₹ 7,113,764
K2-23Add for capacity above 7,50,000 upto 10,00,000 litreslitre₹ 6.75
K2-24Cost of 10,00,000 litres capacityjob₹ 8,800,094
K2-25Add for capacity above 10,00,000 upto 15,00,000 litreslitre₹ 6.02
K2-26Cost of 15,00,000 litres capacityjob₹ 11,807,722
K2-27Add for capacity above 15,00,000 upto 20,00,000 litreslitre₹ 5.52
K2-28Cost of 20,00,000 litres capacityjob₹ 14,568,489
K2-19'Following rates are for seismic zone III. For zone IV, these rates shall be increased by 5% and for zone II, these rates shall be decreased by 5%. Concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones. (Seismic maps attached in this SSR). Notes Conditions from Sr. No. 1 to 19 shall form a part and parcel of the tender and must be included in the draft tender papers for works of R.C.C.- Zinc Alume Container E.S.R.
K2-19'.11) Upto 25,000 litreslitre₹ 39.02
K2-19'.22) Cost of 25,000 litres capacityjob₹ 975,465
K2-19'.33) Add for capacity above 25,000 upto 50,000 litreslitre₹ 20.39
K2-19'.44) Cost of 50,000 litres capacityjob₹ 1,485,227
K2-19'.55) Add for capacity above 50,000 upto 75,000 litreslitre₹ 14.4
K2-19'.66) Cost of 75,000 litres capacityjob₹ 1,845,104
K2-19'.77) Add for capacity above 75,000 upto 1,00,000 litreslitre₹ 13.4
K2-19'.88) Cost of 1,00,000 litres capacityjob₹ 2,180,003
K2-19'.99) Add for capacity above 1,00,000 upto 1,50,000 litreslitre₹ 10.57
K2-19'.1010) Cost of 1,50,000 litres capacityjob₹ 2,708,273
K2-19'.1111) Add for capacity above 1,50,000 upto 2,00,000 litreslitre₹ 9.62
K2-19'.1212) Cost of 2,00,000 litres capacityjob₹ 3,189,433
K2-19'.1313) Add for capacity above 2,00,000 upto 2,50,000 litreslitre₹ 8.53
K2-19'.1414) Cost of 2,50,000 litres capacityjob₹ 3,615,901
K2-19'.1515) Add for capacity above 2,50,000 upto 3,00,000 litreslitre₹ 7.73
K2-19'.1616) Cost of 3,00,000 litres capacityjob₹ 4,002,252
K2-19'.1717) Add for capacity above 3,00,000 upto 4,00,000 litreslitre₹ 7.58
K2-19'.1818) Cost of 4,00,000 litres capacityjob₹ 4,760,006
K2-19'.1919) Add for capacity above 4,00,000 upto 5,00,000 litreslitre₹ 6.85
K2-19'.2020) Cost of 5,00,000 litres capacityjob₹ 5,445,500
Make the estimate with these rates. BESTimate fills the description, unit and rate when you pick the item code — Measurement, Abstract and Summary in Excel.Try BESTimate →

Source: Maharashtra Jeevan Pradhikaran State Schedule of Rates 2023-24 (w.e.f. 20/06/2023), sections E to N. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.

Need the full estimate, not just one item?

BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.

Pre-register free →

Made free with BESTimate by F K Consultant · estimate.fkconsultant.com/calculators · approximate figures — check against your drawings and local rates.