CodeDescriptionUnitRate
I3-1Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note: One coupler shall be provided with each full length of pipe cost of which is included rates below.
I3-1.a.iLIGHT — 15 mm. ( 0.96 kg./m)rmt₹ 88
I3-1.a.iiLIGHT — 20 mm. ( 1.42 kg./m)rmt₹ 131
I3-1.a.iiiLIGHT — 25 mm. ( 2.03 kg./m)rmt₹ 179
I3-1.a.ivLIGHT — 32 mm. ( 2.61 kg./m)rmt₹ 228
I3-1.a.vLIGHT — 40 mm. ( 3.29 kg./m)rmt₹ 285
I3-1.a.viLIGHT — 50 mm. ( 4.18 kg./m)rmt₹ 348
I3-1.a.viiLIGHT — 65 mm. ( 5.92 kg./m)rmt₹ 479
I3-1.a.viiiLIGHT — 80 mm. ( 6.98 kg./m)rmt₹ 575
I3-1.a.ixLIGHT — 100 mm. ( 10.20 kg./m)rmt₹ 815
I3-1.b.iMEDIUM — 15 mm. ( 1.23 kg./m)rmt₹ 105
I3-1.b.iiMEDIUM — 20 mm. ( 1.59 kg./m)rmt₹ 135
I3-1.b.iiiMEDIUM — 25 mm. ( 2.40 kg./m)rmt₹ 206
I3-1.b.ivMEDIUM — 32 mm. ( 3.17 kg./m)rmt₹ 259
I3-1.b.vMEDIUM — 40 mm. ( 3.65 kg./m)rmt₹ 299
I3-1.b.viMEDIUM — 50 mm. ( 5.16 kg./m)rmt₹ 413
I3-1.b.viiMEDIUM — 65 mm. ( 6.63 kg./m)rmt₹ 524
I3-1.b.viiiMEDIUM — 80 mm. ( 8.64 kg./m)rmt₹ 689
I3-1.b.ixMEDIUM — 100 mm. ( 12.40 kg./m)rmt₹ 981
I3-1.b.xxMEDIUM — 125 mm ( 16.70 kg/m)rmt₹ 1,336
I3-1.b.xxiMEDIUM — 150 mm.( 19.70 kg./m)rmt₹ 1,571
I3-1.c.iHEAVY — 15 mm. ( 1.46 kg./m)rmt₹ 120
I3-1.c.iiHEAVY — 20 mm. ( 1.91 kg./m)rmt₹ 154
I3-1.c.iiiHEAVY — 25 mm. ( 2.99 kg./m)rmt₹ 241
I3-1.c.ivHEAVY — 32 mm. ( 3.97 kg./m)rmt₹ 305
I3-1.c.vHEAVY — 40 mm. ( 4.47 kg./m)rmt₹ 354
I3-1.c.viHEAVY — 50 mm. ( 6.24 kg./m)rmt₹ 490
I3-1.c.viiHEAVY — 65 mm. ( 8.02 kg./m)rmt₹ 630
I3-1.c.viiiHEAVY — 80 mm. ( 10.30 kg./m)rmt₹ 805
I3-1.c.ixHEAVY — 100 mm. ( 14.70 kg./m)rmt₹ 1,163
I3-1.c.xHEAVY — 125 mm ( 18.30 kg/m)rmt₹ 1,439
I3-1.c.xiHEAVY — 150 mm ( 21.80 kg./m)rmt₹ 1,729
I3-2Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge.
I3-2.a.iLIGHT — 15 mm. ( 0.96 kg./m)rmt₹ 32
I3-2.a.iiLIGHT — 20 mm. ( 1.42 kg./m)rmt₹ 36
I3-2.a.iiiLIGHT — 25 mm. ( 2.03 kg./m)rmt₹ 45
I3-2.a.ivLIGHT — 32 mm. ( 2.61 kg./m)rmt₹ 50
I3-2.a.vLIGHT — 40 mm. ( 3.29 kg./m)rmt₹ 62
I3-2.a.viLIGHT — 50 mm. ( 4.18 kg./m)rmt₹ 75
I3-2.a.viiLIGHT — 65 mm. ( 5.92 kg./m)rmt₹ 109
I3-2.a.viiiLIGHT — 80 mm. ( 6.98 kg./m)rmt₹ 120
I3-2.a.ixLIGHT — 100 mm. ( 10.20 kg./m)rmt₹ 144
I3-2.b.iMEDIUM — 15 mm. ( 1.23 kg./m)rmt₹ 35
I3-2.b.iiMEDIUM — 20 mm. ( 1.59 kg./m)rmt₹ 38
I3-2.b.iiiMEDIUM — 25 mm. ( 2.40 kg./m)rmt₹ 46
I3-2.b.ivMEDIUM — 32 mm. ( 3.17 kg./m)rmt₹ 53
I3-2.b.vMEDIUM — 40 mm. ( 3.65 kg./m)rmt₹ 69
I3-2.b.viMEDIUM — 50 mm. ( 5.16 kg./m)rmt₹ 81
I3-2.b.viiMEDIUM — 65 mm. ( 6.63 kg./m)rmt₹ 118
I3-2.b.viiiMEDIUM — 80 mm. ( 8.64 kg./m)rmt₹ 132
I3-2.b.ixMEDIUM — 100 mm. ( 12.40 kg./m)rmt₹ 144
I3-2.b.xMEDIUM — 125 mm ( 16.70 kg/m)rmt₹ 155
I3-2.b.xiMEDIUM — 150 mm.( 19.70 kg./m)rmt₹ 161
I3-2.c.iHEAVY — 15 mm. ( 1.46 kg./m)rmt₹ 37
I3-2.c.iiHEAVY — 20 mm. ( 1.91 kg./m)rmt₹ 41
I3-2.c.iiiHEAVY — 25 mm. ( 2.99 kg./m)rmt₹ 49
I3-2.c.ivHEAVY — 32 mm. ( 3.97 kg./m)rmt₹ 57
I3-2.c.vHEAVY — 40 mm. ( 4.47 kg./m)rmt₹ 73
I3-2.c.viHEAVY — 50 mm. ( 6.24 kg./m)rmt₹ 91
I3-2.c.viiHEAVY — 65 mm. ( 8.02 kg./m)rmt₹ 127
I3-2.c.viiiHEAVY — 80 mm. ( 10.30 kg./m)rmt₹ 155
I3-2.c.ixHEAVY — 100 mm. ( 14.70 kg./m)rmt₹ 144
I3-2.c.xHEAVY — 125 mm ( 18.30 kg/m)rmt₹ 160
I3-2.c.xiHEAVY — 150 mm ( 21.80 kg./m) Note: Only 85% rate shall be payable till satisfactory hydraulic testing is given.rmt₹ 172
I3-3Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessary and reinstating to original postion.
I3-3.a.iLIGHT — 15 mm. ( 0.96 kg./m)km₹ 2,779
I3-3.a.iiLIGHT — 20 mm. ( 1.42 kg./m)km₹ 4,168
I3-3.a.iiiLIGHT — 25 mm. ( 2.03 kg./m)km₹ 4,168
I3-3.a.ivLIGHT — 32 mm. ( 2.61 kg./m)km₹ 5,556
I3-3.a.vLIGHT — 40 mm. ( 3.29 kg./m)km₹ 6,946
I3-3.a.viLIGHT — 50 mm. ( 4.18 kg./m)km₹ 8,335
I3-3.a.viiLIGHT — 65 mm. ( 5.92 kg./m)km₹ 12,503
I3-3.a.viiiLIGHT — 80 mm. ( 6.98 kg./m)km₹ 13,891
I3-3.a.ixLIGHT — 100 mm. ( 10.20 kg./m)km₹ 15,280
I3-3.b.iMEDIUM — 15 mm. ( 1.23 kg./m)km₹ 4,168
I3-3.b.iiMEDIUM — 20 mm. ( 1.59 kg./m)km₹ 4,168
I3-3.b.iiiMEDIUM — 25 mm. ( 2.40 kg./m)km₹ 5,556
I3-3.b.ivMEDIUM — 32 mm. ( 3.17 kg./m)km₹ 5,556
I3-3.b.vMEDIUM — 40 mm. ( 3.65 kg./m)km₹ 6,946
I3-3.b.viMEDIUM — 50 mm. ( 5.16 kg./m)km₹ 8,335
I3-3.b.viiMEDIUM — 65 mm. ( 6.63 kg./m)km₹ 12,503
I3-3.b.viiiMEDIUM — 80 mm. ( 8.64 kg./m)km₹ 13,891
I3-3.b.ixMEDIUM — 100 mm. ( 12.40 kg./m)km₹ 15,280
I3-3.b.xMEDIUM — 125 mm ( 16.70 kg/m)km₹ 16,669
I3-3.b.xiMEDIUM — 150 mm.( 19.70 kg./m)km₹ 18,059
I3-3.c.iHEAVY — 15 mm. ( 1.46 kg./m)km₹ 4,168
I3-3.c.iiHEAVY — 20 mm. ( 1.91 kg./m)km₹ 4,168
I3-3.c.iiiHEAVY — 25 mm. ( 2.99 kg./m)km₹ 5,556
I3-3.c.ivHEAVY — 32 mm. ( 3.97 kg./m)km₹ 6,946
I3-3.c.vHEAVY — 40 mm. ( 4.47 kg./m)km₹ 8,335
I3-3.c.viHEAVY — 50 mm. ( 6.24 kg./m)km₹ 9,724
I3-3.c.viiHEAVY — 65 mm. ( 8.02 kg./m)km₹ 13,891
I3-3.c.viiiHEAVY — 80 mm. ( 10.30 kg./m)km₹ 16,669
I3-3.c.ixHEAVY — 100 mm. ( 14.70 kg./m)km₹ 15,280
I3-3.c.xHEAVY — 125 mm ( 18.30 kg/m)km₹ 18,059
I3-3.c.xiHEAVY — 150 mm ( 21.80 kg./m)km₹ 19,448
Make the estimate with these rates. BESTimate fills the description, unit and rate when you pick the item code — Measurement, Abstract and Summary in Excel.Try BESTimate →

Source: Maharashtra Jeevan Pradhikaran State Schedule of Rates 2023-24 (w.e.f. 20/06/2023), sections E to N. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.

Need the full estimate, not just one item?

BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.

Pre-register free →

Made free with BESTimate by F K Consultant · estimate.fkconsultant.com/calculators · approximate figures — check against your drawings and local rates.