CPWD DSR 2023 · section 20

43 items of section 20 (Pile Work) of the CPWD DSR 2023 — code, description, unit and rate. Units: nos, per test, rmt.

← All sections of CPWD DSR 2023

CodeDescriptionUnitRate
20.1Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap):
20.1.1400 mm dia pilesrmt₹ 2,767
20.1.2450 mm dia pilesrmt₹ 3,430.65
20.1.3500 mm dia pilesrmt₹ 4,129.95
20.1.4550 mm dia pilesrmt₹ 4,530.9
20.1.5750 mm dia pilesrmt₹ 7,738.55
20.1.61000 mm dia pilesrmt₹ 12,748.45
20.1.71200 mm dia pilesrmt₹ 16,671.05
20.1.81500 mm dia pilesrmt₹ 23,577.75
20.2Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).
20.2.1450 mm dia pilesrmt₹ 2,278.3
20.2.2500 mm dia pilesrmt₹ 2,703.25
20.2.3600 mm dia pilesrmt₹ 3,637.2
20.2.4750 mm dia pilesrmt₹ 5,581.2
20.2ABoring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.
20.2A.1600 mm dia pilesrmt₹ 5,386.25
20.2A.2750 mm dia pilesrmt₹ 7,758.75
20.2A.31000 mm dia pilesrmt₹ 12,990.8
20.2A.41200 mm dia pilesrmt₹ 17,025.75
20.2A.51500 mm dia pilesrmt₹ 24,408.8
20.3Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):
20.3.1300 mm dia pilesrmt₹ 3,065.6
20.3.2400 mm dia pilesrmt₹ 3,797.3
20.3.3450 mm dia pilesrmt₹ 4,232.75
20.3.4550 mm dia pilesrmt₹ 4,721.15
20.4Extra over single under ream for providing additional bulbs in under reamed piles, under specified diameter(only the nos. of extra bulbs are to be paid)
20.4.1300 mm dia pilesnos₹ 2,626.3
20.4.2400 mm dia pilesnos₹ 2,924.45
20.4.3450 mm dia pilesnos₹ 3,104.2
20.4.4550 mm dia pilesnos₹ 3,360.15
20.5Providing, driving (with vibrating pile driving hammer complete with power units & accessories) and installing driven Pre-cast reinforced cement concrete piles of specified diameter and length below the pile cap in M-25 cement concrete to carry safe working load not less than specified with a central through preformed hole with M.S. black pipe of dia, 40 mm for grouting with cement sand grouting of mix 1:2 (1cement: 2 coarse sand) under sufficient positive pressure to ensure complete filling including centring, shuttering, driving and removing the steel casing pipe and lifting casing etc. complete but excluding the cost of steel reinforcement. (Length of pile for payment shall be measured from top of the shoe to the bottom of pile cap).
20.5.1400 mm dia pilesrmt₹ 3,727.8
20.5.2450 mm dia pilesrmt₹ 4,766.25
20.5.3500 mm dia pilesrmt₹ 4,931.35
20.5.4550 mm dia pilesrmt₹ 5,633
20.5.5750 mm dia pilesrmt₹ 10,846.8
20.5.61000 mm dia pilesrmt₹ 14,946.4
20.6.1Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Single pile upto 50 tonne Safe capacity
20.6.1.1Initial test (Test Load 2.5 times the Safe capacity)per test₹ 54,771.5
20.6.1.2Routine test (Test Load 1.5 times the Safe capacity)per test₹ 19,632.4
20.6.2Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Single pile above 50 tonne and upto 100 tonne Safe capacity
20.6.2.1Initial test (Test Load 2.5 times the Safe capacity)per test₹ 61,173.35
20.6.2.2Routine test (Test Load 1.5 times the Safe capacity)per test₹ 32,436.1
20.6.3Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge. — Group of two or more piles upto 50 tonne Safe capacity
20.6.3.1Initial test (Test Load 2.5 times the Safe capacity)per test₹ 70,420.5
20.6.3.2Routine test (Test Load 1.5 times the Safe capacity)per test₹ 40,545.15
20.7.1Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for. — Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for. — Single pile
20.7.1.1Upto 50 tonne Safe capacity pileper test₹ 19,632.4
20.7.1.2Above 50 tonne and upto 100 tonne Safe capacity pileper test₹ 32,436.1
20.7.2Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for. — Group of two or more piles
20.7.2.1Upto 400 tonne Safe capacity of groupper test₹ 40,545.15
20.8Lateral load testing of single pile in accordance with IS: Code of practice IS: 2911 (Part IV) for determining safe allowable lateral load on pile:
20.8.1Upto 50 tonne capacity pileper test₹ 19,632.4
20.8.2Above 50 tonne and upto 100 tonne capacity pileper test₹ 32,862.9
20.9Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS:14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project.per test₹ 1,153.2
Make the estimate with these rates. BESTimate fills the description, unit and rate when you pick the item code — Measurement, Abstract and Summary in Excel.Try BESTimate →

Source: Delhi Schedule of Rates 2023 (Vol. 1 & 2), Central Public Works Department — Delhi market rates as on 01.04.2023; apply the cost index for your place and date. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.

Need the full estimate, not just one item?

BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.

Pre-register free →

Made free with BESTimate by F K Consultant · estimate.fkconsultant.com/calculators · approximate figures — check against your drawings and local rates.