Dismantling And Demolishing

CPWD DSR 2023 · section 15

92 items of section 15 (Dismantling And Demolishing) of the CPWD DSR 2023 — code, description, unit and rate. Units: 1000 Nos, cum, kg, metre height, metre span, nos, rmt, sqm.

← All sections of CPWD DSR 2023

CodeDescriptionUnitRate
15.1Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge.cum₹ 851.5
15.2Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
15.2.1Nominal concrete 1:3:6 or richer mix (including equivalent design mix)cum₹ 2,434.25
15.2.2Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)cum₹ 1,503.6
15.3Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.cum₹ 3,551.25
15.4Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge.cum₹ 3,177.25
15.5Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge.sqm₹ 1,147.2
15.6Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work.kg₹ 9.05
15.7Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
15.7.1In mud mortarcum₹ 704.9
15.7.2In lime mortar with old mughal brickscum₹ 1,783.35
15.7.3In lime mortarcum₹ 851.5
15.7.4In cement mortarcum₹ 2,060.2
15.8Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
15.8.1From brick work in mud mortar1000 Nos₹ 4,658.45
15.8.2From brick work in lime mortar1000 Nos₹ 5,355.3
15.8.3From brick work in cement mortar1000 Nos₹ 6,700.8
15.9Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
15.9.1In lime mortarcum₹ 1,158.1
15.9.2In cement mortarcum₹ 2,458.95
15.10Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
15.10.1In lime mortarcum₹ 1,464.25
15.10.2In cement mortarcum₹ 2,877.75
15.11Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):
15.11.1In lime mortarcum₹ 478.55
15.11.2In cement mortarcum₹ 689.2
15.12Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:
15.12.1Of area 3 sq. metres and belownos₹ 367.2
15.12.2Of area beyond 3 sq. metresnos₹ 502.75
15.13Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead:
15.13.1Of area 3 sq. metres and belownos₹ 143.5
15.13.2Of area beyond 3 sq. metresnos₹ 188.9
15.14Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:
15.14.1Of sectional area 40 square centimetres and abovecum₹ 4,459.1
15.14.2Of sectional area below 40 square centimetresrmt₹ 17.85
15.15Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional span of one metre or part thereof beyond 10 metres:
15.15.1Of sectional area 40 square centimetres and abovemetre span₹ 589.55
15.15.2Of sectional area below 40 square centimetresmetre span₹ 1.65
15.16Extra for dismantling trusses, rafters, purlins etc. of wood work for every additional height of one metre or part thereof beyond 5 metres:
15.16.1Of sectional area 40 square centimetres and abovemetre height₹ 857
15.16.2Of sectional area below 40 square centimetresmetre height₹ 3.4
15.17Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in:
15.17.1R.S. Joistskg₹ 3.4
15.17.2Channels, angles, tees and flatskg₹ 2.3
15.18Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.kg₹ 5.65
15.19Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.kg₹ 3.85
15.20Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metresmetre span₹ 0.85
15.21Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres.metre height₹ 0.85
15.22Extra for marking of structural steel work required to be re-erected.kg₹ 4.65
15.23Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.
15.23.1For thickness of tiles 10 mm to 25 mmsqm₹ 73.4
15.23.2For thickness of tiles above 25 mm and up to 40 mmsqm₹ 113.35
15.24Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead:cum₹ 1,317.65
15.25Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.sqm₹ 266.45
15.26Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.sqm₹ 105.35
15.27Demolishing mud phaska in terracing and disposal of material within 50 metres lead.cum₹ 914.3
15.28Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:
15.28.1G.S. Sheetsqm₹ 164.95
15.28.2Asbestos Cement sheetsqm₹ 77.3
15.29Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately), including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.cum₹ 2,664.65
15.30Dismantling jack arch roofing and floors including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.sqm₹ 253.9
15.31Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.sqm₹ 209.9
15.32Demolishing thatch roofing including mats, bamboo, jaffari etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.sqm₹ 57.7
15.33Dismantling wooden ballies in posts and struts including stacking within 50metres lead.rmt₹ 20.95
15.34Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of:
15.34.1T’ or ‘L’ iron or pipenos₹ 230.9
15.34.2R.C.C.nos₹ 243.3
15.35Cutting ballies or wooden posts of fencing at the point of projection above the concrete or ground and stacking the same within 50 metres lead.nos₹ 13.45
15.36Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.kg₹ 36.8
15.37Dismantling wooden trellis work excluding frames but including stacking the serviceable material within 50 metres lead.sqm₹ 64.85
15.38Dismantling expanded metal or I.R.C. fabrics with necessary battens and beading including stacking the serviceable material within 50 metres lead.sqm₹ 75.8
15.39Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead:
15.39.1Up to 10 mm thicksqm₹ 61
15.39.2Thickness above 10 mm up to 25 mmsqm₹ 77.75
15.39.3Thickness above 25 mm up to 40 mmsqm₹ 90.35
15.40Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:
15.40.1Thickness up to 40 mmsqm₹ 289.3
15.40.2Thickness above 40 mm up to 75 mmsqm₹ 433.55
15.41Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead.sqm₹ 56.35
15.42Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material within 50 metres lead:
15.42.175 to 80 mm dia pipermt₹ 75.7
15.42.2100 mm dia pipermt₹ 78
15.42.3150 mm dia pipermt₹ 80.25
15.43Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
15.43.1Water bound macadam roadsqm₹ 217.45
15.43.2bituminous roadsqm₹ 428.5
15.44Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of Engineer-in-charge:
15.44.115 mm to 40 mm nominal borermt₹ 149.8
15.44.2Above 40 mm nominal borermt₹ 161.4
15.45Dismantling C.I. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of Engineer-in-charge:
15.45.1Up to 150 mm diameterrmt₹ 332.4
15.45.2Above 150 mm dia up to 300 mm diarmt₹ 456.65
15.45.3Above 300 mm diameterrmt₹ 614.3
15.46Dismantling steel cylinder R.C. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metres lead as per direction of Engineer-in-charge:
15.46.1Up to 600 mm diameterrmt₹ 695.25
15.46.2Above 600 mm diameterrmt₹ 1,752.45
15.47Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge:
15.47.1Up to 150 mm diameterrmt₹ 332.15
15.47.2Above 150 mm diameterrmt₹ 403.05
15.48Taking out C.I. cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge.nos₹ 697.4
15.49Taking out C.I. cover with frame from R.C.C. top slab of inspection chambers of various sizes including demolishing of R.C.C. work manually/ by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead as per direction of Engineer-in-charge.nos₹ 406.75
15.50Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead.nos₹ 4,623.7
15.51Dismantling of road gully chamber of various sizes including C.I. grating with frame including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead including refilling the excavated gap.nos₹ 958.75
15.52Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead.nos₹ 112.05
15.53Dismantling of C.I. sluice valve including stacking of useful materials within a lead of 50 metres
15.53.1Up to 150 mm diameternos₹ 319.5
15.53.2Above 150 mm diameternos₹ 1,184.15
15.54Dismantling of spindle fire hydrant including stacking of useful materials within 50 metres lead.nos₹ 726.35
15.55Dismantling of cement concrete platform along with curtain walls and base concrete etc. including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead:
15.55.1120 x 120 cm (outside to outside)nos₹ 1,104.05
15.55.2210 x 120 cm (outside to outside)nos₹ 1,693.35
15.55.3320 x 120 cm (outside to outside)nos₹ 2,396.95
15.56Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.sqm₹ 54.65
15.57Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer- in-charge.sqm₹ 56.35
15.58Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.cum₹ 2,818.9
15.59Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge.cum₹ 420.8
15.60Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.cum₹ 263.95
Make the estimate with these rates. BESTimate fills the description, unit and rate when you pick the item code — Measurement, Abstract and Summary in Excel.Try BESTimate →

Source: Delhi Schedule of Rates 2023 (Vol. 1 & 2), Central Public Works Department — Delhi market rates as on 01.04.2023; apply the cost index for your place and date. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.

Need the full estimate, not just one item?

BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.

Pre-register free →