| Code | Description | Unit | Rate |
|---|---|---|---|
| R3-CS-CW-1 | Providing and laying in position plain cement concrete of specified grade cement with trap/granite/quartzite/gneiss metal mixing in concrete mixer including bailing out water, compacting, finishing surface, curing and including the cost of centering and shuttering at all level : | ||
| R3-CS-CW-1-a | Nominal Mix of 1:1.5:3 (1 cement OPC: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | cum | ₹ 7,467 |
| R3-CS-CW-1-b | Nominal Mix of 1:2:4 (1 cement OPC: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | cum | ₹ 7,232 |
| R3-CS-CW-1-c | Nominal Mix of 1:3:6 (1 Cement OPC: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | cum | ₹ 6,682 |
| R3-CS-CW-1-d | Nominal Mix of 1:4:8 (1 Cement OPC: 4 coarse sand : 8 graded stone aggregate 20 mm nominal size). | cum | ₹ 6,453 |
| R3-CS-CW-1-e | Nominal Mix of 1:1.5:3 (1 cement (PPC) : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | cum | ₹ 7,283 |
| R3-CS-CW-1-f | Nominal Mix of 1:2:4 (1 cement (PPC): 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | cum | ₹ 7,085 |
| R3-CS-CW-1-g | Nominal Mix of 1:3:6 (1 Cement (PPC): 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | cum | ₹ 6,581 |
| R3-CS-CW-1-h | Nominal Mix of 1:4:8 (1 Cement (PPC): 4 coarse sand : 8 graded stone aggregate 20 mm nominal size). | cum | ₹ 6,375 |
| R3-CS-CW-1-j | Nominal Mix of 1:1:2 (1 cement OPC: 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) | cum | ₹ 7,624 |
| R3-CS-CW-2-a | Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix from Engineer-in-charge and fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS 456 and uniform blending with cement is to be ensured in accordance with clauses 5.2 and 5.2.1 of IS: 456- 2000 in the items of ready mixed concrete and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, including the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. All works upto plinth level. | ||
| R3-CS-CW-2-a-1 | M-20 grade plain cement concrete (cement content considered @ 260 kg/cum). | cum | ₹ 6,432 |
| R3-CS-CW-2-a-2 | M-15 grade plain cement concrete (cement content considered @ 240 kg/cum). | cum | ₹ 6,002 |
| R3-CS-CW-2-a-3 | M-10 grade plain cement concrete (cement content considered @ 220 kg/cum). | cum | ₹ 5,807 |
| R3-CS-CW-2-b | Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix from Engineer-in-charge and fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS 456 and uniform blending with cement is to be ensured in accordance with clauses 5.2 and 5.2.1 of IS: 456- 2000 in the items of ready mixed concrete and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, including the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. All works above plinth . | ||
| R3-CS-CW-2-b-1 | M-20 grade plain cement concrete (cement content considered @ 260 kg/cum). | cum | ₹ 7,865 |
| R3-CS-CW-2-b-2 | M-15 grade plain cement concrete. (cement content considered @ 240 kg. /cum). | cum | ₹ 7,435 |
| R3-CS-CW-2-b-3 | M-10 grade plain cement concrete (cement content considered @ 220 kg/cum). | cum | ₹ 7,240 |
| R3-CS-CW-3-a | Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix by Engineer-in-charge and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, including the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. All works upto plinth level. | ||
| R3-CS-CW-3-a-1 | M-20 grade plain cement concrete (cement content considered @ 260 kg/cum as per IS 456 table showing minimum cement content). | cum | ₹ 6,432 |
| R3-CS-CW-3-a-2 | M-15 grade plain cement concrete (cement content considered @ 240 kg/cum as per IS 456 table showing minimum cement content). | cum | ₹ 6,002 |
| R3-CS-CW-3-a-3 | M-10 grade plain cement concrete (cement content considered @ 220 kg/cum as per IS 456 table showing minimum cement content). | cum | ₹ 5,807 |
| R3-CS-CW-3-b | Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix by Engineer-in-charge and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, including the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. All works above plinth . | ||
| R3-CS-CW-3-b-1 | M-20 grade plain cement concrete (cement content considered @ 260 kg/cum as per IS 456 table showing minimum cement content). | cum | ₹ 7,865 |
| R3-CS-CW-3-b-2 | M-15 grade plain cement concrete. (cement content considered @ 240 kg. /cum as per IS 456 table showing minimum cement content). | cum | ₹ 7,435 |
| R3-CS-CW-3-b-3 | M-10 grade plain cement concrete (cement content considered @ 220 kg/cum as per IS 456 table showing minimum cement content). | cum | ₹ 7,240 |
| R3-CS-CW-4 | Providing, hoisting and fixing at all level precast reinforced cement concrete work in string courses, bands, copings,drain covers, bed plates, anchor blocks, plain window sills and the like including the cost of required centering, shuttering and reinforcement, of | ||
| R3-CS-CW-4-a | Nominal Mix 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). | cum | ₹ 8,378 |
| R3-CS-CW-4-b | Nominal Mix 1:1.5:3 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). | cum | ₹ 8,613 |
| R3-CS-CW-5 | Providing, hoisting and fixing at all level precast reinforced cement concrete in small lintels not exceeding 1.5m clear span up to all level including the cost of required centering, shuttering and reinforcement, with | ||
| R3-CS-CW-5-a | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | cum | ₹ 13,257 |
| R3-CS-CW-5-b | 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | cum | ₹ 13,492 |
| R3-CS-CW-6 | Providing precast cement concrete Jali of Nominal Mix 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete excluding plastering of the jambs, sills and soffits. | ||
| R3-CS-CW-6-a | 100 mm thick | sqm | ₹ 3,055 |
| R3-CS-CW-6-b | 50 mm thick | sqm | ₹ 1,997 |
| R3-CS-CW-6-c | 40 mm thick | sqm | ₹ 1,634 |
| R3-CS-CW-6-d | 25 mm thick | sqm | ₹ 1,507 |
| R3-CS-CW-7 | Providing and laying in position ready mixed design mix M-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying and the cost of centering, shuttering, finishing and excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.The Mix design as per particular specfications shall be got approved by Engineer-in-Charge before execution of the item.The rate shall include cost of all specified materials and operations at all levels and heights, including the cost of centering, shuttering and and excluding reinforcement which shall be paid under relevant item.(Note :- Cement content considered in this item is @ 300 kg/cum as per IS 456 table showing minimum cement content. No extra will be paid nor any amount will recovered on account of variation of cement in mix design as per specifications for controlled concrete). All works (including Centering & Shuttering) | ||
| R3-CS-CW-7-a | Foundations, footings, bases of columns, rafts, pilecap | cum | ₹ 7,056 |
| R3-CS-CW-7-b | Walls (any thickness) including attached butteresses, retaining wall, shear wall, diaphragm wall , trench,pit walls, etc | cum | ₹ 10,793 |
| R3-CS-CW-7-c | Slabs, Suspended floors, roofs, landings, balconies, canopy and access platform | cum | ₹ 12,270 |
| R3-CS-CW-7-d | Lintels, beams, plinth beams, girders, floor beam, coping. | cum | ₹ 9,506 |
| R3-CS-CW-7-e | Columns, Pillars, Piers, Posts and Struts. | cum | ₹ 11,568 |
| R3-CS-CW-7-f | Stairs (waist slab), folded slab, inclined slab | cum | ₹ 11,718 |
| R3-CS-CW-7-g | Spiral staircases (including landing). | cum | ₹ 13,011 |
| R3-CS-CW-7-h | Extra for shuttering in circular work arches, columns (20% of respective centering and shuttering items). | cum | ₹ 2,314 |
| R3-CS-CW-7-i | Weather shade, Chajjas, corbels, cantilever beam, etc., including edges. | cum | ₹ 13,289 |
| R3-CS-CW-8 | Vertical and horizontal fins individually or forming box louvers, facias and eaves | cum | ₹ 12,324 |
| R3-CS-CW-9 | Extra for providing two stage centering for height more than 4.5m and upto 9m height in terms of floor slabs including finishing, etc | cum | ₹ 1,988 |
| R3-CS-CW-10 | Extra for providing two stage centering for height more than 9m and upto 13m height in terms of floor slabs including finishing, etc | cum | ₹ 2,753 |
| R3-CS-CW-10-a | Extra for providing two stage centering for height more than 13m and upto 20m height in terms of floor slabs including finishing, etc | cum | ₹ 3,977 |
| R3-CS-CW-11 | Extra for providing two stage centering for height more than 4.5m and upto 9m height in terms of floor beams including finishing, etc | cum | ₹ 1,297 |
| R3-CS-CW-12 | Extra for providing two stage centering for height more than 9m and upto 13m height in terms of floor beams including finishing, etc | cum | ₹ 1,785 |
| R3-CS-CW-12-a | Extra for providing two stage centering for height more than 13m and upto 20m height in terms of floor beams including finishing, etc | cum | ₹ 2,457 |
| R3-CS-CW-13 | Extra for providing two stage centering for height more than 4.5m and upto 9m height in terms of columns including finishing, etc | cum | ₹ 1,812 |
| R3-CS-CW-14 | Extra for providing two stage centering for height more than 9m and upto 13m height in terms of columns including finishing, etc | cum | ₹ 2,507 |
| R3-CS-CW-14-a | Extra for providing two stage centering for height more than 13m and upto 20m height in terms of columns including finishing, etc | cum | ₹ 3,591 |
| R3-CS-CW-15 | Rebate in items of M20 R.C.C. for providing leaner mix of M15 with prior permission. | cum | ₹ 430 |
| R3-CS-CW-16 | Extra and over for providing richer RMC of M-25 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 330 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 560 |
| R3-CS-CW-17 | Extra and over for providing richer RMC of M-30 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 340 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 780 |
| R3-CS-CW-18 | Extra and over for providing richer RMC of M-35 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 350 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 1,213 |
| R3-CS-CW-19 | Extra and over for providing richer RMC of M-40 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 360 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 1,544 |
| R3-CS-CW-20 | Extra and over for providing richer RMC of M-45 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 435 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 1,788 |
| R3-CS-CW-21 | Extra and over for providing richer RMC of M-50 grade cement concrete instead of M20 (Note :- Cement content considered in this item is @ 450 kg/cum as per IS 456 table showing minimum cement content.) | cum | ₹ 2,237 |
| R3-CS-CW-22 | Designing, providing and laying in any position, without usage of vibrator, ready mixed design mix Self Compacting Cement Concrete (SCC) of required grade for Form Finished reinforced cement concrete work in super structure at all floor levels, using cement & fly ash, content as required including transportation of concrete through transit mixer to site of laying for all leads, all floor levels, pumping of concrete to site of laying but excluding the cost of centering, shuttering, including admixtures conforming to IS 9103 as per designed proportions to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. The Mix design as per particular specfications shall be got approved by Engineer-in-Charge before execution of the item.The rate shall include cost of all specified materials and operations , but exclude the cost of centering, shuttering and reinforcement which shall be paid under relevant item. | ||
| R3-CS-CW-22-a | M-30 Grade SCC | cum | ₹ 8,755 |
| R3-CS-CW-22-b | M-35 Grade SCC | cum | ₹ 9,100 |
| R3-CS-CW-22-c | M-40 Grade SCC | cum | ₹ 9,560 |
| R3-CS-CW-22-d | M-45 Grade SCC | cum | ₹ 9,847 |
| R3-CS-CW-22-e | M-50 Grade SCC | cum | ₹ 10,022 |
| R3-CS-CW-23 | Vacuum Dewatered Concrete Flooring Providing and laying C.C. floor of mix M-25 with ready mixed concrete from RMC. The ready mixed concrete shall be laid and vibrated with a poker vibrator and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. The channel shuttering spaced 4m apart shall be included in this item.) | cum | ₹ 7,785 |
| R3-CS-CW-24 | Vacuum Dewatered Concrete Flooring Providing and laying C.C. floor of mix M-20 with ready mixed concrete from RMC. The ready mixed concrete shall be laid and vibrated with a poker vibrator and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. The channel shuttering spaced 4m apart shall be included in this item.) | cum | ₹ 6,601 |
| R3-CS-CW-25 | Encased Rolled Steel Section Encasing rolled steel sections, in beams and columns, with cement concrete of 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) including centering and shuttering complete but excluding cost of reinforcement. | cum | ₹ 12,718 |
| R3-CS-CW-26 | Encased Rolled Steel Section Encasing rolled steel sections, in beams and columns, with cement concrete of 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20mm nominal size) including centering and shuttering complete but excluding cost of reinforcement. | cum | ₹ 12,943 |
| R3-CS-CW-27 | Encased Rolled Steel Section Encasing rolled steel section in grillages with cement concrete of Nominal Mix 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) including centering and shuttering but excluding cost of expanded metal and hangers. | cum | ₹ 7,948 |
| R3-CS-CW-28 | Encased Rolled Steel Section Encasing rolled steel section in grillages with cement concrete of Nominal Mix 1:1½:3 (1 cement: 1½ coarse sand: 3 graded stone aggregate 20mm nominal size) including centering and shuttering but excluding cost of expanded metal and hangers. | cum | ₹ 8,182 |
| R3-CS-CW-29 | Encased Rolled Steel Section Extra for providing and fixing expanded metal mesh of size 20x60mm and strands 3.25mm wide 1.6mm thick weighing 3.64 kg. per sqm. for encasing of rolled steel sections in beams, columns and grillages excluding cost of hangers. | sqm | ₹ 560 |
| R3-CS-CW-30 | Centering and shuttering of steel plates with M.S. Angles including strutting, propping etc. and removal of form for : | ||
| R3-CS-CW-30-a | Foundations, footings, bases of columns, rafts, pilecap | sqm | ₹ 341 |
| R3-CS-CW-30-b | Walls (any thickness) including attached butteresses, ,retaining wall, shear wall, diaphragm wall etc | sqm | ₹ 681 |
| R3-CS-CW-30-c | Suspended floors, roofs, landings, balconies and access platform. | sqm | ₹ 687 |
| R3-CS-CW-30-d | Lintels, beams, plinth beams, girders, and cantilevers beam. | sqm | ₹ 550 |
| R3-CS-CW-30-e | Columns, Pillars, Piers, Posts and Struts. | sqm | ₹ 813 |
| R3-CS-CW-30-f | Stairs (waist slab), folded slab, inclined slab | sqm | ₹ 619 |
| R3-CS-CW-30-g | Spiral staircases (including landing). | sqm | ₹ 636 |
| R3-CS-CW-30-h | Vertical and horizontal fins individually or forming box louvers | sqm | ₹ 1,040 |
| R3-CS-CW-30-i | Extra for shuttering in circular or octagonal work , columns (20% of respective centering and shuttering item for column,pillar, post). | sqm | ₹ 163 |
| R3-CS-CW-30-j | Cornices and mouldings | sqm | ₹ 777 |
| R3-CS-CW-30-k | Weather shade, Chajjas, corbels, cantilever beam etc., including edges. | sqm | ₹ 793 |
| R3-CS-CW-30-l | Extra and over on item no. CS-CW-24-m for additional cost of centering for arches exceeding 6m span including all strutting, bolting, wedging etc. and removal (area of soffit to be measured). | sqm | ₹ 737 |
| R3-CS-CW-30-m | Arches, Domes, Shells upto 6m span | sqm | ₹ 1,783 |
| R3-CS-CW-31 | Architectural Form Finished Concrete Shuttering Centering and shuttering including strutting, propping etc. and removal of form for Architectural Form finished concrete work using water proof ply 12mm thick conforming to IS:710. The water proof ply shall be used for only 2(two) repetitions after first use, and any repetition after the first usage shall be taken up only after prior approval for water proof ply material for suitability for use in form finish concrete (Architectural finishes) by the Engineer-in-Charge in walls (any thickness) including attached pilasters, butteresses, plinth and string courses, Suspended floors, roofs, landings, balconies and access platform, Shelves (Cast in situ), Columns, Pillars, Piers, Abutments, Posts and Struts, Stairs, (excluding landings) except spiral-staircases with water proof ply 12mm thick. | sqm | ₹ 891 |
| R3-CS-CW-32 | Architectural Form Finished Concrete Shuttering Centering and shuttering including strutting, propping etc. and removal of form for Architectural Form finished concrete work using water proof ply 12mm thick conforming to IS:710. The water proof ply shall be used for only 2(two) repetitions after first use, and any repetition after the first usage shall be taken up only after prior approval for water proof ply material for suitability for use in form finish concrete (Architectural finishes) by the Engineer-in-Charge in lintels, beams, plinth beams, girders, bressumers and cantilevers Small lintel not exceeding 1.5m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like with water proof ply 12mm thick. | sqm | ₹ 786 |
| R3-CS-CW-33 | Architectural Form Finished Concrete Shuttering Centering and shuttering including strutting, propping etc. and removal of form for Architectural Form finished concrete work using water proof ply 12mm thick conforming to IS:710. The water proof ply shall be used for only 2(two) repetitions after first use, and any repetition after the first usage shall be taken up only after prior approval for water proof ply material for suitability for use in form finish concrete (Architectural finishes) by the Engineer-in-Charge in shuttering in circular work for column in plan with water proof ply 12mm thick. | sqm | ₹ 1,114 |
| R3-CS-CW-34 | Architectural Form Finished Concrete Shuttering Extra over and above Centering and shuttering for making chamfering in columns, beams, walls with wooden battens of varying sizes & shape as shown in detail typical section drawing .The rate includes providing required battens fixed to ply shuttering with nails etc.at all heights complete as per design and drawing and direction of Engineer-in-Charge.The wooden batten shall be used for only 2(two) repetitions after first use, and any repetition after the first usage shall be taken up only after prior approval of the material by the Engineer-in- Charge for suitability for use in form finish concrete works (Architectural finishes) . Length of batten for chamfering shall be measured and paid for in this item. | rmt | ₹ 47 |
| R3-CS-CW-35 | Providing and fixing in position steel bars reinforcement of various diameters for R.C.C. pile, pile caps, footings,raft,retaining wall,shear wall, lift wall, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, coping, fins, arches, etc. as per detailed designs, drawings and bar bending schedules,including straightening, cutting, bending, hooking the bars, binding with wires or tack welding, supporting as required etc. all complete at all levels. | ||
| R3-CS-CW-35-a | Mild steel bars | MT | ₹ 98,314 |
| R3-CS-CW-35-b | HYSD steel bars (Fe 415) | MT | ₹ 82,375 |
| R3-CS-CW-35-c | Thermo-Mechanically Treated steel bars. (Fe 500 D) | MT | ₹ 80,080 |
| R3-CS-CW-35-d | Thermo-Mechanically Treated steel bars. (Fe 600 D) | MT | ₹ 88,774 |
| R3-CS-CW-35-e | Corrosion Resistant Steel (500 CRS D) | MT | ₹ 90,706 |
| R3-CS-CW-36 | Shotcrete (Gunite treatment) Providing and applying epoxy resin in 2 coats before guniting to bond fresh concrete and old concrete surface as per manufacturer’s specifications and inclusive of cleaning of reinforcement as directed. | sqm | ₹ 455 |
| R3-CS-CW-37 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) to the R.C.C. slabs, walls, floor etc. to an average thickness 40 mm and providing B.R.C. fabric 15 cm sq.mesh, 3.15 mm (10 G) thick or M. S. bars 6 mm dia. at 10 cm to 20 cm C/C both ways as directed. The rate includes the cost of removal of loose or cracked concrete and roughening the surfaces to receive guniting but excludes rate of scaffolding which will be paid seperately. | sqm | ₹ 1,324 |
| R3-CS-CW-38 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) to the R. C. C. ledges and cornices portions by cutting the projected portions 30 cm to 60 cm ( as required ) with water drip arrangement as required etc complete. The rate excludes scaffolding which will be paid seperately. | sqm | ₹ 1,381 |
| R3-CS-CW-39 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) to encase R. S. beams and joists to an average thickness of 50 mm including removing all loose or cracked concrete from the sides and roughening the same to prepare them to receive treatment and providing B. R. C. fabric 15 cm sq. mesh 3.15 mm thick (10 G) of M. S. bars 6 mm dia. 100 mm C/C as directed including rendering smooth the guniting surface as in the above items. The gunited beams shall be of original shape and size. Extra thickness in the web portion will be paid separately. The rate excludes scaffolding which will be paid seperately. | sqm | ₹ 1,420 |
| R3-CS-CW-40 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) R. C. C. beams, corbels, columns,vertical face etc., to an average thickness of 50 mm including removing all loose or cracked concrete from the site and roughening the same to prepare them to receive gunite treatment and providing B. R. C. fabric 15 cm sq. mesh 3.15 mm (10 G) thick or M. S. bars 6 mm dia. at 10 cm to 20 cm C/C both ways as directed, including rendering smooth the gunited surface as in the above items. The gunited beams, columns shall be as far as practicable to the original size. The rate excludes scaffolding which will be paid seperately. | sqm | ₹ 1,420 |
| R3-CS-CW-41 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) (without reinforcement of M.S. bars or B.R.C. fabric) for extra thickness of gunite over and above that specified in all the above items. The rate excludes scaffolding which will be paid seperately. | cum | ₹ 18,878 |
| R3-CS-CW-42 | Shotcrete (Gunite treatment) Guniting in the proportion 1:3.5 (C.S.) to an average thickness of 50 mm for waterproofing basement slabs, basement lift pit walls, retaining wall,etc., including provision of B.R.C. fabric 15 cm sq. mesh 3.15 mm thick (10 G) or M.S. bars 6 mm dia. at 10 cm to 30 cm C/C as directed roughening the original surface for receiving the gunite and leaving the site clean. The rate excludes scaffolding which will be paid seperately. | sqm | ₹ 1,450 |
| R3-CS-CW-43 | Shotcrete (Gunite treatment) Guniting in the proportion of 1:3.5 (C.S.) to the R.C.C. slabs, walls, vertical face, floor etc. to an average thickness 25 mm and providing B.R.C. fabric 15 cm sq.mesh, 3.15 mm (10 G) thick or M. S. bars 6 mm dia. at 10 cm to 20 cm C/C both ways as directed. The rate includes the cost of removal of loose or cracked concrete and roughening the surfaces to receive guniting. The rate excludes scaffolding which will be paid seperately. | sqm | ₹ 1,169 |
| R3-CS-CW-44 | Shotcrete (Gunite treatment) Jacketting the existing column of size as shown in the drawing by removing the concrete cover to reinforcement, by chipping or other suitable means to expose the reinforcement of existing column in order to make available the same for binding the extra reinforcement as shown in the drawing and also removal of rust, scales of the reinforcement in order to provide and apply approved make of epoxy resin to get proper bond with newly laid M25 grade concrete. The aforesaid concrete shall be laid by the sides of the existing column with uniform thickness of 115 mm or as specified, for jacketing purposes thereby increasing the sectional dimensions by 150 mm or as specified (excluding finishing) at any height with requisite shuttering, centring, scaffolding, proping, repairing the existing surface as specified and also removal of debris, curing etc. complete as per design and drawing etc. directed. (NOTE :- Reinforcement will be paid separately under respective item of schedule ). | cum | ₹ 17,595 |
| R3-CS-CW-44a | Shotcrete (Gunite treatment) Jacketting the existing beam or beam connections as shown in the drawing by removing the concrete cover to reinforcement, by chipping or other suitable means to expose the reinforcement of existing beam or beam connections in order to make available the same for binding the extra reinforcement as shown in the drawing and also removal of rust, scales of the reinforcement in order to provide and apply approved make of epoxy resin to get proper bond with newly laid M25 grade (Site mix or RMC) concrete. The aforesaid concrete shall be laid by the sides of the existing beam with uniform thickness of 75 mm or as specified, for jacketing purposes thereby increasing the sectional dimensions by 100 mm or as specified (excluding finishing) at any height with requisite shuttering, centring, scaffolding, proping, repairing the existing surface as specified and also removal of debris, curing etc. complete as per design and drawing etc. directed. (NOTE :- Reinforcement will be paid separately under respective item of schedule ). | cum | ₹ 14,768 |
| R3-CS-CW-45 | Shotcrete (Gunite treatment) Repairing to the existing RCC structural members (vertical or horizontal) using ready mix Micro Concrete of approved brand where the thickness of repair is more than 30 mm and upto 115 mm. It can be used for carrying out extensive repairs to beams, columns and other structural elements, repairing of structural members subjected to repetitive loading & for Jacketing of beams, columns and other structural elements for strengthening. Procedure for carrying out repairing/jacketing using ready mix micro concrete- Surface preparation- (separate payment shall be made ) All loose traces of concrete or mortar, dust, grease oil, etc. must be removed. Damaged or contaminated concrete shall be removed to obtain a keyed aggregate exposed surface. Non-impact/ vibrating cleaning methods, e.g. grit or high pressure water blasting are recommended. Cut the edges of the repair vertically to a minimum depth of 20 mm. Clean all exposed reinforcement to a minimum grade of Sa 2 according to ISO 8501-1 / ISO 2944-4. Ensure back of reinforcing bar is also clean. Where reinforcing bars are corroded, cut back the concrete to at least 20mm behind the reinforcing bars and coat old and new with approved epoxy coating for corrosion protection Water Powder ration Grit blast around the reinforcing bars to remove corrosion products or any other method recommended by Engineer In charge or Structural Consultant. Replace the affected part of reinforcing bar if the diameter after grit blasting is found reduced by more than 20% of the original diameter on the advice of the structural engineer responsible for the works. Bond Coat- (separate payment shall be made) Providing & applying One coat of structural grade epoxy bond coat by brush conforming to ASTM-C-882-87 to the prepared concrete surface to be repaired / strengthened and micro concreting pouring shall be done when the surface is tacky. Formwork – (No separate payment shall be made) The forms must be of good quality, treated with a chemical release agent for smooth release, provided with water drain holes, strong and well braced to withstand the fluid pressure of the mortar until it hardens. Mixing - Only full bags are mixed. Damaged or opened bags should not be used. Mix the ready mix Micro Concrete in a forced action pan mixer, or with a helical paddle attached to a low speed (300-600rpm) mixer for 3 minutes until a lump free, flowable consistency is achieved. Only use clean water. Mixing water needed: 3.25 to 3.75 litres per 25kg bag or as recommended by the Manufacturer of Micro Concrete. Allow the mortar to rest for 2 - 3 minutes and then remix briefly before pouring into formwork. If temperature more than 40°C then use chilled water for mixing. Mortar application- The minimum temperatures must be maintained during application and for at least 24 hours thereafter for optimum curing of the product. The prepared substrate should be pre- soaked, preferably for 24 hours, but at least 2 hours before applying Ready Mix Micro Concrete ensure all water is removed from formwork prior to installation and formwork is resealed. Ready Mix Micro Concrete should be pumped or poured into the prepared formwork until the void is filled. Pumping is recommended for larger pours. Do not vibrate Ready Mix Micro Concrete as it could lead to segregation. The formwork should be removed after 1-3 days and a curing compound applied. If subsequent coats are to be applied the use of clear polythene is recommended for the first three days after removal of formwork. For repairs beyond 80m m to 100mm in thickness, extend Ready Mix Micro Concrete with up to 25kg of 5-12mm sized washed, saturated surface-dry (SSD), graded low absorption, high density aggregates. Protective coatings- (separate payment shall be made) Subsequent coatings of any anticarbonation barriers or silane impregnations should be applied if recommend by the Structural Engineer. Curing - Minimum 7 days curing shall be done to the newly repaired/jacketed area using any suitable method. Required Compressive strength (ASTM C109 7cm cube) Ready Mix Micro Concrete used on site shall be sent for testing of compressive strength and minimum strength required to be achieved is as follows – 1 Day-15 MPa, 3 Day-25 MPa, 7 Day-35 MPa, 28 Day-40 MPa. Note- Payment is to be made by weight premixed of micro concrete product consumed as per site register records. | kg | ₹ 41 |
| R3-CS-CW-46 | Providing and laying premoulded asphalt filler for expansion joints cut to the required depth and camber. | ||
| R3-CS-CW-46-a | 12 mm thick | sqm | ₹ 825 |
| R3-CS-CW-46-b | 18 mm thick | sqm | ₹ 961 |
| R3-CS-CW-46-c | 25 mm thick | sqm | ₹ 1,102 |
| R3-CS-CW-47 | Providing and fixing copper strip upto 25cm wide and of 1.6 mm thick as specified for expansion joints etc. as per design. | kg | ₹ 704 |
| R3-CS-CW-48 | Providing and fixing thermocol board for expansion joints as directed. | ||
| R3-CS-CW-48-a | 25 mm thick | sqm | ₹ 98 |
| R3-CS-CW-48-b | 35 mm thick | sqm | ₹ 223 |
| R3-CS-CW-48-c | 50 mm thick | sqm | ₹ 317 |
| R3-CS-CW-49 | Sealing the expansion joints by polysulphide sealant so as to make the joint completely water tight complete as directed. | ||
| R3-CS-CW-49-a | size 25 mm x 25 mm | rmt | ₹ 1,495 |
| R3-CS-CW-49-b | size 35 mm x 25 mm | rmt | ₹ 2,026 |
| R3-CS-CW-49-c | size 50 mm x 25 mm | rmt | ₹ 2,822 |
| R3-CS-CW-50 | Providing & fixing 25mm thick alkali resistant, closed cell polymer based expansion joint filler board of approved make, having minimum density of 28 Kg/ Cum & compression strength of 0.21 Kg/sqm; using double sided adhesive tape, all complete as per the particular specifications and instructions of the Engineer in-charge. | sqm | ₹ 483 |
| R3-CS-CW-51-a | Providing and fixing sheet covering over expansion joints with iron screws as per design to match the colour / shade of wall treatment. Aluminium fluted strips 3.15mm thick. | ||
| R3-CS-CW-51-a-1 | 150mm wide | rmt | ₹ 705 |
| R3-CS-CW-51-a-2 | 200mm wide | rmt | ₹ 881 |
| R3-CS-CW-51-b | Providing and fixing sheet covering over expansion joints with iron screws as per design to match the colour / shade of wall treatment. Non-asbestos fibre cement board 6 mm thick as per IS:14862 | ||
| R3-CS-CW-51-b-1 | 150mm wide | rmt | ₹ 387 |
| R3-CS-CW-51-b-2 | 200mm wide | rmt | ₹ 449 |
| R3-CS-CW-52 | Providing and fixing hydrophilic water sealing materials (20mm x 10mm) of assorted profiles of approved make at construction joints at different locations during the construction of Basement Raft RCC and peripheral RCC Retaining wall, construction joints and at other water retaining structures like UG and OH tanks including creating necessary nominal trapezoidal key shape in the formwork finish or by mason’s finish, including applying suitable adhesives and sealants as per particular specification and as recommended, supplied by the approved manufacturer for proper and highly secure bonding with substrate, rough / smooth and wet / dry, proper splicing and jointing at corners, T, L and X junctions using suitable glue, at all such locations, and as directed by Engineer in-charge. | rmt | ₹ 239 |
| R3-CS-CW-53 | Providing and applying Hydrophobic Silane-Siloxane coating of approved make, to exposed concrete surfaces at all heights & leads and wherever instructed by Engineer-In- Charge. The treatment shall be in two coats wet-on-wet or as recommended by approved manufacturer including preparation of surfaces by cleaning, curing, protecting, independent double legged scaffolding etc. complete .The rate includes the cost of all materials , its application by specialized applicators by spray coating with airless sprayer, cleaning the substrate of all laitance, construction dust, contaminants, double scaffolding, labour etc., all complete and at all heights, leads as per particular specification & directions of Engineer-in- Charge. Guarantee Bond in the prescribed proforma shall be executed by the contractor for the satisfactory performance of the application for 10 years. | sqm | ₹ 195 |
| R3-CS-CW-54 | Chipping /removing loose concrete upto reinforcement bars, without damaging the reinforcement, removing all the loose materials and to make all the exposed surfaces free from oil, dust and all impurities etc complete. | sqm | ₹ 305 |
| R3-CS-CW-55 | Removing corrosion of steel reinforcement by mechanical means like wire brushing, chipping to remove loose rust and then applying rust removal solution by using brush application, leaving the surface for at least 15 to 30 minutes, then removing loose materials by scrubbing or with brush. After detachment of loose scales reddish rusted surface is still left exposed, this has to be retreated or as per approved manufacturers specifications. (Note:- Consider surface area of concrete for payment) | sqm | ₹ 46 |
| R3-CS-CW-56 | Repairing to the existing RCC structural members (vertical or horizontal) using ready mix Polymer Modified Mortar (Fibre reinforced structural grade repair mortar) of approved brand where the thickness of repair is upto 15 mm. It can be used for carrying out extensive repairs to beams, columns, slab, and other structural elements, repairing of structural members subjected to repetitive loading for strengthening. Procedure for carrying out repair Polymer Modified Mortar - Surface preparation- (separate payment shall be made ) All loose traces of concrete or mortar, dust, grease oil, etc. must be removed. Damaged or contaminated concrete shall be removed to obtain a keyed aggregate exposed surface. Non-impact/ vibrating cleaning methods, e.g. grit or high pressure water blasting are recommended. Clean all exposed reinforcement to a minimum grade of Sa 2 according to ISO 8501-1 / ISO 2944-4. Ensure all visible portions of the reinforcing bar is clean. Where reinforcing bars are corroded, cut back the concrete around the reinforcing bars, Grit blast to remove corrosion products from around reinforcing bars and coat with approved epoxy coating for corrosion protection or any other protective coating as recommended by the Structural Engineer to protect from corrosion. Replace the affected part of rebar if the diameter after grit blasting is found reduced by more than 20% of the original diameter on the advice of the structural engineer responsible for the works. Bond Coat- (separate payment shall be made only for bond coat used for old surface to new surface) Providing & applying One coat of structural grade epoxy bond coat by brush conforming to ASTM-C-882-87 to the prepared concrete surface to be repaired / strengthened and repairing with PMM shall be done when the surface is tacky. Mixing - Only full bags are mixed. Damaged or opened bags should not be used. Mix the ready-mix Polymer Modified Mortar in a forced action pan mixer, or with a helical paddle attached to a low speed (300-600rpm) mixer for 3 minutes until a lump free, thixotropic consistency is achieved. Only use clean water. Mixing water needed: 3.75 to 4.25 litres per 25kg bag or as recommended by the Manufacturer of Polymer Modified Mortar. Allow the mortar to rest for 2 - 3 minutes and then remix briefly before pouring into formwork. If temperature more than 40°C then use chilled water for mixing. Mortar application- The minimum temperatures must be maintained during application and for at least 24 hours thereafter for optimum curing of the product. The prepared substrate should be pre- soaked, preferably for 24 hours, but at least 2 hours before applying Polymer Modified Mortar. The surface must be saturated surface dry, but without standing water. Polymer Modified Mortar can be spray- or hand-applied. Apply mixed product directly to the prepared damp substrate, or wet on wet onto the primed surface. Spraying the material with the necessary pressure will ensure good adhesion of the material. A thin scrape coat or contact layer before building up to the required thickness, wet on wet, will improve adhesion especially in case of hand application. Apply to the desired layer thickness upto 15 mm and level using a screeding bar, trowel or wooden board. Smoothing with a trowel or finishing by float or sponge can be done as soon as the mortar has begun to stiffen. Protective coatings Subsequent coatings of any anticarbonation barriers or silane impregnations should be applied if recommended by the Structural Engineer. Plaster- (No separate payment shall be made) The repaired surface shall be matched to the surrounding surface by providing required thickness of plaster internal or external plaster. Curing Minimum 7 days curing shall be done to the newly repaired area using any suitable method. Required Compressive strength (ASTM C109 7cm cube) Ready Mix Polymer Modified Mortar used on site shall be sent for testing of compressive strength and minimum strength required to be achieved is as follows – 1 Day-15 MPa, 3 Day-25 MPa, 7 Day-35 MPa, 28 Day-45 MPa. | sqm | ₹ 3,063 |
| R3-CS-CW-57 | Repairing to the existing RCC structural members (vertical or horizontal) using ready mix Polymer Modified Mortar (Fibre reinforced structural grade repair mortar) of approved brand where the thickness of repair is upto 30 mm in two layers. It can be used for carrying out extensive repairs to beams, columns, slab, and other structural elements, repairing of structural members subjected to repetitive loading for strengthening. Procedure for carrying out repair Polymer Modified Mortar - Surface preparation- (separate payment shall be made ) All loose traces of concrete or mortar, dust, grease oil, etc. must be removed. Damaged or contaminated concrete shall be removed to obtain a keyed aggregate exposed surface. Non-impact/ vibrating cleaning methods, e.g. grit or high pressure water blasting are recommended. Clean all exposed reinforcement to a minimum grade of Sa 2 according to ISO 8501-1 / ISO 2944-4. Ensure all visible portions of the reinforcing bar is clean. Where reinforcing bars are corroded, cut back the concrete around the reinforcing bars, Grit blast to remove corrosion products from around reinforcing bars and coat with approved epoxy coating for corrosion protection or any other protective coating as recommended by the Structural Engineer to protect from corrosion. Replace the affected part of rebar if the diameter after grit blasting is found reduced by more than 20% of the original diameter on the advice of the structural engineer responsible for the works. Bond Coat- (separate payment shall be made only for bond coat used for old surface to new surface) Providing & applying One coat of structural grade epoxy bond coat by brush conforming to ASTM-C-882-87 to the prepared concrete surface to be repaired / strengthened and repairing with PMM shall be done when the surface is tacky. Mixing - Only full bags are mixed. Damaged or opened bags should not be used. Mix the ready-mix Polymer Modified Mortar in a forced action pan mixer, or with a helical paddle attached to a low speed (300-600rpm) mixer for 3 minutes until a lump free, thixotropic consistency is achieved. Only use clean water. Mixing water needed: 3.75 to 4.25 litres per 25kg bag or as recommended by the Manufacturer of Polymer Modified Mortar. Allow the mortar to rest for 2 - 3 minutes and then remix briefly before pouring into formwork. If temperature more than 40°C then use chilled water for mixing. Mortar application- The minimum temperatures must be maintained during application and for at least 24 hours thereafter for optimum curing of the product. The prepared substrate should be pre- soaked, preferably for 24 hours, but at least 2 hours before applying Polymer Modified Mortar. The surface must be saturated surface dry, but without standing water. Polymer Modified Mortar can be spray- or hand-applied. Apply mixed product directly to the prepared damp substrate, or wet on wet onto the primed surface. Spraying the material with the necessary pressure will ensure good adhesion of the material. A thin scrape coat or contact layer before building up to the required thickness, wet on wet, will improve adhesion especially in case of hand application. Apply to the desired layer thickness upto 15 mm in single layer and after hardening, provide second layer of required thickness (total upto 30 mm) and level using a screeding bar, trowel or wooden board. If required, bond coat shall be provided as per the recommendation of manufacturer between two layers of polymer Modified Mortar and no separate payment shall be made for it. (However, between old & new surface of concrete bond coat shall be applied & paid separately) Smoothing with a trowel or finishing by float or sponge can be done as soon as the mortar has begun to stiffen. Protective coatings Subsequent coatings of any anticarbonation barriers or silane impregnations should be applied if recommended by the Structural Engineer. Plaster- ((No separate payment shall be made)) The repaired surface shall be matched to the surrounding surface by providing required thickness of plaster internal or external plaster. Curing Minimum 7 days curing shall be done to the newly repaired/jacketed area using any suitable method. Required Compressive strength (ASTM C109 7cm cube) Ready Mix Polymer Modified Mortar used on site shall be sent for testing of compressive strength and minimum strength required to be achieved is as follows – 1 Day-15 MPa, 3 Day-25 MPa, 7 Day-35 MPa, 28 Day-45 MPa. | sqm | ₹ 5,866 |
| R3-CS-CW-58 | Extra for spreading broken glass pieces under pavement 0.12 cu.m. of broken glass pieces per 10 sq.m. of area. | sqm | ₹ 48 |
| R3-CS-CW-59 | Providing Pre fabricated concrete louvres of Nominal Mix 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete | sqm | ₹ 1,441 |
| R3-CS-CW-60 | Providing and applying modified approved polymer coating for concrete surfaces up to plinth in locations where attack on steel in anticipated due to excessive presence of sulphates and chlorides in ground water. | sqm | ₹ 950 |
| R3-CS-CW-61 | Providing hot dip galvanizing conforming to IS 12594-1988 to reinforcement bars, having mass of zinc coating shall not be less than 610 gms/sqm of bar surface area, unloading the material at Pre-treatment area and 1) Degreasing to remove grease, oil, dirt, paints 2) Rinsing with water to remove any of the de-greasing solution carried forward on the surface of bars. 3) Acid pickling by immersing bars in a dilute solution of Hydrochloric acid solution to remove all rust, mill scales, any other surface contaminants 4) Rinsing with water to remove excess acid and iron salts. 5) Jet spraying the surface with water for removal of pickling salts, 6) Fluxing - immersing the bars in a heated aqueous zinc ammonium chloride solution forming an oxide film to make surface optimally clean and ready for galvanizing, 7) Bars then to be dried on hot plate, 8) Galvanising - The bars to be immersed in a high grade 99.95% pure molten zinc to allow reaction to form a series of zinc-iron alloy layers for sufficient time to have the minimum coating thickness as specified, 9) Quenching - The bars then to be immersed in a quenching solution to stop galvanising reaction to ensure proper adhesion, 10) Passivation - to make bars less sucesptible to wet storage stains, the bars to be treated by dipping in sodium dichromate solution (trivalent) (0.2%), 11) Finishing - if necessary the material to be cleaned to remove excess zinc drips and runs on surface. 12) Packing the material wherever if necessary, loading for shipment to the customers site excluding transportation. Minimum requirements: 1) Minimum zinc bath size must be 8 mtr (L) x 1.8 Mtr (D) x 1.2 Mtr (W). 2) Minimum length of Pre and Post Treatment tanks must be 11 Mtrs. 3) Zinc purity in the bath must be minimum 98.5% as per IS 209. 4) Vibrators installed along with dual speeds in Dipping crane. 5) BIS License required as per IS 12594 - 1988. | ||
| R3-CS-CW-61-a | For 8 to 12 mm reinforcement bars | MT | ₹ 4,140 |
| R3-CS-CW-61-b | For 16 to 25 mm reinforcement bars | MT | ₹ 4,140 |
| R3-CS-CW-61-c | For 32 to 40 mm reinforcement bars | MT | ₹ 4,416 |
| R3-CS-CW-62 | Providing & Laying Plum concrete consisting of 80% P.C.C. mix (1:3:6) and 20% Rubble stone of maximum size of 150 mm laid in layers with ramming consolidating,watering including dewatering cost,seigniorage & conveyance of all materials,labour charges,machine mixing,finishing the surface etc. complete. | cum | ₹ 6,785 |
| R3-CS-CW-63 | -Do- as per Item No. 3.1.3 above but with evenly distributed plums of size 160 mm and above upto any reasonable size to a maximum limit of 30% by volume of concrete including mechanically vibrating and compacting, curing, cleaning, dewatering, preparing surface if any, required shuttering including providing pockets of any size and depth, forming drains, sumps etc. complete. | cum | ₹ 6,085 |
| R3-CS-CW-64 | Centering and Wooden ( Marine plywood) shuttering including strutting, propping, beacing, bolting, wedging, casting, striking, etc. and removal of form for : ( Note: props shall consist of well designed adequately braced | ||
| R3-CS-CW-64-a | Foundations, footings, bases of columns, rafts, pilecap | sqm | ₹ 427 |
| R3-CS-CW-64-b | Walls (any thickness) including attached butteresses, ,retaining wall, shear wall, diaphragm wall , Columns, Pillars, Piers, Posts and Struts. etc | sqm | ₹ 909 |
| R3-CS-CW-64-c | Suspended floors, roofs, landings, balconies and access platform, Lintels, beams, plinth beams, girders, and cantilevers beam, Stairs (waist slab), folded slab, inclined slab etc. | sqm | ₹ 881 |
| R3-CS-CW-65 | Providing & fixing parallel threaded couplers conforming to IS- 16172 code on “Reinforcement couplers for mechanical splices of bars for concrete reinforcement Specifications”, to reinforcement bars includinh threading enlargement at connection by forcing, protecting the prepare reinforcement bars at related operations as required to complete the works as per the directions of engineer incharge. | ||
| R3-CS-CW-65-a | 25 mm | nos | ₹ 196 |
| R3-CS-CW-65-b | 32 mm | nos | ₹ 270 |
Source: Unified Schedule of Rates 2023 (Buildings), Municipal Corporation of Greater Mumbai. Rates are shown as published; check the official book and its correction slips before you submit an estimate. BESTimate is not issued by or affiliated with this department.
Need the full estimate, not just one item?
BESTimate makes the whole government-format estimate — Measurement, Abstract and Summary in Excel — with BMC, PWD, CPWD, MJP and CIDCO rates built in. Launching 26 November 2026 · first 99 to pre-register get 50% off for 6 months.
Made free with BESTimate by F K Consultant · estimate.fkconsultant.com/calculators · approximate figures — check against your drawings and local rates.